Waterproof Biothane Dog Long Lead 1/2" x 10' with Solid Brass Clip stitched onto Lead -much SAFER than using Grommets (Copy)

Regular price $44.99

Colour
Description

Our Biothane Working Lead is created from a high-quality Biothane waterproof coated webbing. 

Durable, cleanable, waterproof & smell proof.

Super Heavy Biothane webbing has up to 750 lbs of breaking strength.

Solid brass hardware clip is ideal for our Bermuda environment. Will not rust.

Brass clip is attached with heavy duty stitching-not grommets. A much SAFER option. Grommets can pop out, resulting in brass clip detaching and your dog being LOOSE!

Made in the USA from the highest quality materials.

Shipping, Delivery, & Pick Up

Shop online and choose shipping, local pickup, or delivery at checkout.

  • Shipping: Rates are calculated at checkout based on your order’s weight and destination.
  • Pickup: Collect your order at Boats n Barks, 46 Crow Lane, Devonshire, at Rance’s Boat Yard. Contact us to arrange pickup outside store hours.
  • Bermuda delivery: Island-wide delivery within 24 hours of ordering. Free on orders of $50 or more, or $10 for orders under $50.

Questions? Email info@boatsnbarks.com or call 441-292-1843.